A heating build-up should be designed as a coordinated construction. Alternatives to a conventional screed can change weight, levels and the programme, but the final floor must remain compatible with the chosen system.
Identify the exact construction
Ask the designer for the heating system, insulation, screed or boards and finish in one drawing. Product names and thicknesses matter more than broad descriptions such as liquid or dry.
Separate setting from readiness for flooring
Do not equate an early set or a walkable surface with permission to apply the finish. The relevant suppliers should specify moisture assessment, commissioning and installation conditions.
Check support beneath the finish
Do not assume resin or PSR can be poured directly over heating pipes, mats or a dry panel system. Obtain confirmation for the complete build-up, including preparation and movement-joint requirements.
Build the programme from instructions
Use the actual products’ drying, testing and curing requirements. Avoid applying one number of days to cement, calcium sulphate and specialist fast-drying products. Resolve uncertain interfaces before ordering.
Discuss your project with Puur
Send plans, photographs of the existing base, intended use and any heating details. We can discuss the finish, samples and the information needed before agreeing a specification.
Ask Puur about your floor · View Puur PSR specification information
Frequently Asked Questions
Identify the exact construction — what should I establish?
Ask the designer for the heating system, insulation, screed or boards and finish in one drawing. Product names and thicknesses matter more than broad descriptions such as liquid or dry.
Separate setting from readiness for flooring — what should I establish?
Do not equate an early set or a walkable surface with permission to apply the finish. The relevant suppliers should specify moisture assessment, commissioning and installation conditions.
Check support beneath the finish — what should I establish?
Do not assume resin or PSR can be poured directly over heating pipes, mats or a dry panel system. Obtain confirmation for the complete build-up, including preparation and movement-joint requirements.
Build the programme from instructions — what should I establish?
Use the actual products’ drying, testing and curing requirements. Avoid applying one number of days to cement, calcium sulphate and specialist fast-drying products. Resolve uncertain interfaces before ordering.
Is Puur PSR the same as a resin floor?
No. Puur PSR is a cementitious overlay. Resin finishes and structural polished concrete slabs are different constructions and need their own specifications.